Work has begun to repair the damage to the Lakefront Trail south of Fullerton and between North Ave and Oak St.
As of Monday, 5/9 the Trail was closed south of Fullerton and traffic was being routed onto the soft surface just west and above the section of the Trail being repaired.
Trail traffic will also have to be detoured to the east of the Trail between North Avenue and Oak St. while that section is being repaired.
All work on these areas should be completed prior to Memorial Day.
Thanks, Randy